Telecommunication
& Utilities
 
 
Cambridge Standby Power System
Cambridge, MA
Owner: National Telecommunication Company
Architect: Ames & Whitaker Architects
Engineer: CPS Engineering

 
This new 2.5 MW generator installation was installed along with a 4,000 amp automatic transfer switch at the major Boston area communications hub. In addition, a new switchgear control system tied the two new units into the existing system. All work was completed on time, within budget and without any power interruption.