Schick-Wilkinson Sword, Edge Research & Development

Construction for the new Edge Building included a new, pre-engineered steel building and a manufactured can filling building, attached by a covered walkway. Operating as research and development for Schick’s “Edge Gel” shaving products, the facility includes a wet lab with sinks and a mixing tank. Containers are filled with test products and then with propellants, so new products can be fully evaluated. The scope also included an attached storage shed and improvements to the parking lot and site.

Milford, Connecticut | General Contractor | Architect: Andrew Robinson Architect

Previous
Previous

Rothberg Institute for Childhood Diseases

Next
Next

Stamford Hospital