Greenwich Hospital, Multiple Projects
Petra has been performing work for Greenwich Hospital for over fourteen years. Some of this work includes:
Renovation and expansion of the hospital’s 2,350-square-foot IVF Laboratory Suite located on the 2nd floor of the Watson Building
Renovation on the ground floor of the hospital’s main campus for a new state-of-the-art Center for Hyperbaric Medicine and Wound Healing
Fast-track renovation of the Cohen Pavilion’s CT Simulator Suite to accommodate a new Phillips CT unit
A fast-track renovation of the Linear Accelerator Suite, located on the second floor of the Cohen Pavilion, was completed subsequent to the CT Simulator renovation
Fast-track, multi-phased renovation of the hospital’s West Main Campus medical office building in Stamford for a new Primary Care Physicians Suite
A free-standing, three-story elevator addition between the hospital’s existing off-site medical office building and three-story parking garage on Holly Hill Campus
Installation of a second emergency generator and construction of a sound-attenuated enclosure at the hospital’s off-site medical office building
Replacement of the 24-foot rear pedestrian bridge that connects the second floor of the off-site medical office building to the parking deck roof
Greenwich and Stamford, Connecticut | Construction Manager and General Contractor | Architect: S/L/A/M Collaborative