Yale New Haven Hospital, Pediatric Catheterization Laboratory
The construction of this new state-of-the-art imaging, treatment, and hybrid operating room was completed on a fast-track basis. It was designed as work progressed and was performed in two ten-week phases, requiring considerable coordination by the design, construction, and owner teams. The project included structural reinforcement of the floors, a new partition layout, millwork, a new shielding system, a steel strut system above the ceiling, new finishes, and the installation of an advanced Philips interventional radiology imaging system.
Award:
2010 AGCCT Build Connecticut Award
New Haven, Connecticut | Construction Manager | Architect: BAM Studio