Confidential Client, ETO Sterilizer Addition
The system used by this global medical equipment manufacturer to sterilize their products had to be phased out and replaced with a new system to meet new US EPA standards. The timely completion of the project was critical, as production would come to a halt if the new system was not fully operational by the required date. A ten-inch-thick concrete wall separates the addition from the existing building. The addition contains very sophisticated control systems and requires very stringent air balancing.
Award:
2014 CT-ABC Excellence in Construction Merit Award
North Haven, Connecticut | Construction Manager | Architect: CH2M Hill